PMM Compass

The internal admin rollup — every project, one dashboard.

Web · FastAPI Internal Read-Only Audience · Admins & PMs

PMM Compass is the internal admin dashboard. It rolls up data from every active project Sheet into a single view — totals per Cost Category, vendor concentration, missing-field audit, and project completeness. Where principals see the whole portfolio at once.

PART · I Foundations

1. What PMM Compass Is

Compass is a read-only web dashboard served alongside PMM on the Ground (they share the same FastAPI service). It does not change anything — it observes. Three jobs:

  1. Aggregate across projects — total estimate value, totals per Cost Category
  2. Audit for completeness — components missing prices, missing vendors, stale pushes
  3. Surface exceptions — overdue selections, vendor concentration, sync conflicts

2. Access

Compass is internal-only. Access via Google Workspace SSO; access is limited to staff in the trilogy-internal group. There is no public sign-up.

Open it at https://pmm.trilogypartners.com/admin. The same service hosts both /admin (Compass) and /p/{sheet_id} (on the Ground), so if either is reachable, the other is too.

3. Dashboard Layout

Three main areas:

PART · II Daily Use

4. The Portfolio Strip

The top of the dashboard shows one card per project. Each card answers four questions at a glance:

Cards are color-coded by health — green (current), amber (stale), red (action required).

5. Drill-Down View

Click a project card and you see the full breakdown:

6. Cross-Project Vendor Analysis

The Vendors tab aggregates spend across every active job. Useful for negotiation, capacity planning, and spotting concentration risk.

PART · III Reference

7. Metric Definitions

MetricDefinition
Committed BudgetSum of (Unit Price × Quantity) for components with both fields set
Missing PriceComponents where Unit Price is empty
Missing VendorComponents where Vendor is empty and Cost Type is not Labor
Stale PushLast Horizon push more than 7 days ago
Overdue SelectionSelection whose Deadline is in the past and Status ≠ Confirmed
Sync ConflictComponents with Sync Status = Conflict

8. Refresh Cadence

Compass pulls Sheet data every 5 minutes for active projects, every hour for archived. The "as of" timestamp at the top tells you the freshness. Hard-refresh with the ⟳ button if needed.

PART · IV Care & Repair

9. Troubleshooting

A project is not showing up

The project Sheet must be in the active-projects Drive folder with the standard naming convention, and shared with the Relay service account. Move/share it and it will appear on the next refresh.

Numbers look wrong

Compass is only as accurate as the Sheet. If a project shows zero committed budget, the Sheet is probably missing prices. Drill into the project to confirm.

"Vendor not found in BT"

This banner appears when Compass detects a Sheet vendor name that does not match any vendor in Buildertrend. Either fix the Sheet spelling, or add the vendor in BT before the next Relay sync.

10. Credits

PMM is part of the PMM Tools suite by Trilogy Design Intelligence, a service of Trilogy Partners.

This guide and the tool follow the PMM Attribute Schema v1.0 — the canonical contract shared across PMM Connection, PMM Horizon, PMM in the Sky, PMM on the Ground, PMM Compass, PMM Bridge, PMM Relay, and PMM Converter.

Trilogy Partners. Boots on the Ground, Eyes on the Sky.