PMM Compass
The internal admin rollup — every project, one dashboard.
PMM Compass is the internal admin dashboard. It rolls up data from every active project Sheet into a single view — totals per Cost Category, vendor concentration, missing-field audit, and project completeness. Where principals see the whole portfolio at once.
1. What PMM Compass Is
Compass is a read-only web dashboard served alongside PMM on the Ground (they share the same FastAPI service). It does not change anything — it observes. Three jobs:
- Aggregate across projects — total estimate value, totals per Cost Category
- Audit for completeness — components missing prices, missing vendors, stale pushes
- Surface exceptions — overdue selections, vendor concentration, sync conflicts
2. Access
Compass is internal-only. Access via Google Workspace SSO; access is limited to staff in the trilogy-internal group. There is no public sign-up.
Open it at https://pmm.trilogypartners.com/admin. The same service hosts both /admin (Compass) and /p/{sheet_id} (on the Ground), so if either is reachable, the other is too.
3. Dashboard Layout
Three main areas:
- Portfolio — top-strip cards, one per active project, with key health metrics
- Drill-Down — pick a project to see its detailed breakdown
- Cross-Project — vendor analysis and Cost Category aggregation across all jobs
4. The Portfolio Strip
The top of the dashboard shows one card per project. Each card answers four questions at a glance:
- What is the total committed budget?
- How many components are missing a price or vendor?
- How many selections are overdue?
- When was the last Horizon push?
Cards are color-coded by health — green (current), amber (stale), red (action required).
5. Drill-Down View
Click a project card and you see the full breakdown:
- Components grouped by Cost Category, with subtotals
- Vendor breakdown for the project
- Recent edits feed (from
Last Modifiedtimestamps) - Completeness exceptions: missing prices, missing vendors, conflict statuses
- Internal Notes (visible here, hidden in on the Ground)
6. Cross-Project Vendor Analysis
The Vendors tab aggregates spend across every active job. Useful for negotiation, capacity planning, and spotting concentration risk.
7. Metric Definitions
| Metric | Definition |
|---|---|
| Committed Budget | Sum of (Unit Price × Quantity) for components with both fields set |
| Missing Price | Components where Unit Price is empty |
| Missing Vendor | Components where Vendor is empty and Cost Type is not Labor |
| Stale Push | Last Horizon push more than 7 days ago |
| Overdue Selection | Selection whose Deadline is in the past and Status ≠ Confirmed |
| Sync Conflict | Components with Sync Status = Conflict |
8. Refresh Cadence
Compass pulls Sheet data every 5 minutes for active projects, every hour for archived. The "as of" timestamp at the top tells you the freshness. Hard-refresh with the ⟳ button if needed.
9. Troubleshooting
A project is not showing up
The project Sheet must be in the active-projects Drive folder with the standard naming convention, and shared with the Relay service account. Move/share it and it will appear on the next refresh.
Numbers look wrong
Compass is only as accurate as the Sheet. If a project shows zero committed budget, the Sheet is probably missing prices. Drill into the project to confirm.
"Vendor not found in BT"
This banner appears when Compass detects a Sheet vendor name that does not match any vendor in Buildertrend. Either fix the Sheet spelling, or add the vendor in BT before the next Relay sync.
10. Credits
PMM is part of the PMM Tools suite by Trilogy Design Intelligence, a service of Trilogy Partners.
- Design and requirements — Trilogy Design Intelligence
- Implementation — Claude (Anthropic)
- Questions or issues — christianah@trilogybuilds.com
This guide and the tool follow the PMM Attribute Schema v1.0 — the canonical contract shared across PMM Connection, PMM Horizon, PMM in the Sky, PMM on the Ground, PMM Compass, PMM Bridge, PMM Relay, and PMM Converter.